CLOMR & LOMRSupport.

Engineering analysis and technical documentation to support Conditional Letters of Map Revision and Letters of Map Revision through FEMA’s review process.

Your inquiry goes directly to the engineer.
STA 0+00Plain English

Two letters.One map change.

A CLOMR comes before you build. A LOMR comes after.

A CLOMR (Conditional Letter of Map Revision) is FEMA’s comment on a proposed project: if it’s built as designed, would it meet the requirements to revise the flood map? It provides FEMA’s review of the proposed map change before construction.

A LOMR (Letter of Map Revision) officially changes the flood map after the project is built, based on as-built information.

Not every map question needs a revision. If a structure or lot sits on natural ground above the base flood elevation, a Letter of Map Amendment (LOMA) may be enough. If it was raised by fill, the request is a LOMR-F.

STA 0+00The roadmap

From proposalto a new map.

Click through the six stages. Timing depends on the project, the community and FEMA’s review.

Scope and data

Carried by: Creel

Get FEMA’s effective model, survey the site and confirm what the community requires.

STA 0+00What goes in

The package,built for the reviewer.

Model

Duplicate effective model

FEMA’s effective model reproduced first, so every change is measured against the official baseline.

Model

Corrected effective & existing

Errors fixed and detail added, then the site as it is today.

Model

Proposed or as-built

The project itself, designed (CLOMR) or constructed (LOMR).

Forms

FEMA MT-2 application forms

The standard forms for map revision requests, completed and signed.

Maps

Annotated work maps

Floodplain and floodway boundaries, existing and revised, tied to the model.

Report

Report & certifications

A narrative that explains every change and the data behind it.

STA 0+00When you need one

Projects thatchange the map.

  • Fill or structures that would move the floodplain boundary or change the BFE
  • Channel modifications and stream restoration
  • Bridge and culvert replacements that change water surface elevations
  • Floodway encroachments that would raise the BFE, which need a CLOMR before they can be permitted (44 CFR 60.3(d)(4))
  • Developers who want FEMA’s answer before construction
STA 0+00Questions

Straightanswers.

What should I send to get started?

Send the project location, a brief description, and any important deadline. Mention any surveys, plans, reports, or agency comments you already have. You do not need a complete package to make an initial inquiry.

Can Creel support our civil engineering team?

Creel provides specialized hydrologic and hydraulic support that can be scoped around your team’s project requirements and deliverables.

How are fees and schedules established?

Each assignment is evaluated individually. The proposal establishes the scope, deliverables, schedule, fees, and payment terms.

Does submitting an inquiry start an engineering engagement?

No. An inquiry starts a conversation. Engineering services begin under a separate written agreement.

STA 0+00Get started

Send the location.Start the conversation.

Send the project location, a brief description, and any important deadline. Mention available surveys, plans, prior studies, or agency comments; supporting files can be requested after the initial inquiry.

Each engagement is scoped individually. Scope, schedule, fees, and payment terms are established in the proposal.

Agency coordination and review responses are provided as defined in the agreed scope.

STA 0+00Project review

Change the mapbefore the map changes you.

Email mcreel@creelengineering.comPhone 919-757-2886Your inquiry goes directly to the engineer.